Braided Long Lead – med-large dogs

$70.00

These all Australian leads are best oiled and soften with use.
These leads will outlast your dog as long as you do not allow the dog to chew the lead!

Category:

Description

Description:
• Length: approx. 1500mm
• Width: 19mm
• Solid Brass clip
• Solid Brass ring
• Colour: Brown
• Handmade in Australia

Reviews

There are no reviews yet.

Be the first to review “Braided Long Lead – med-large dogs”

Your email address will not be published. Required fields are marked *